What makes one of these inspections longer than another?
The footprint of the house, whether the space is a basement or a crawl space, how much of the perimeter can actually be reached, how much is stored down there, and how many separate buildings are included. A blocked hatch or a crawl full of goods is the single biggest variable. The price is explained and approved up front and no figure appears on this site.
Reachable perimeter is the real measure. A clear basement perimeter can be walked and read; the same length of wall behind full shelving cannot, and a crawl space with eighteen inches of clearance over heaped soil is slow going whatever its area. Whether there is a vapor barrier to work over, and whether it is intact, changes the time again.
Then it is a question of how many structures. A house on a subdivision lot is one inspection; a house with a shop and a barn on a few acres is three sill lines, three sets of penetrations and three places lumber has been stacked on the ground. Doing them together is far cheaper than doing them separately, and the outbuildings are often where the findings are.
What is actually being looked for down there?
Three things at once: evidence of wood-destroying insects, the moisture conditions that make damage likely, and the openings rodents and other animals are using. They tend to occur in the same places, which is why one inspection covers all three rather than three visits covering one each.
On the insect side, the evidence of a subterranean termite is at ground level by definition: mud tubes on a wall, a pier or a post, soil pressed into a crack, and timber that sounds hollow where a tube reaches it. K-State Research and Extension names the eastern subterranean termite as the most prevalent and damaging termite in Kansas, and the University of Missouri Extension's G7420 covers the same insect across the line.
On the water and rodent side, the readings are simpler and just as useful. A tide line on block, a damp joist end, a torn barrier over bare soil, a gap where the dryer duct goes through. K-State's material on controlling house mice stresses entry points and keeping clutter, firewood and compost away from the building, and a crawl space inspection is where the state of both becomes visible.
Who is allowed to do a termite inspection for a sale here?
In Kansas it is a certification question with a clear answer. The Kansas Department of Agriculture states that termite inspections tied to real-estate transactions, or to loans secured by real estate, require a current commercial applicator certification in subcategory 7A, wood-destroying pests. A homeowner is entitled to ask what the person under the floor holds.
That is the Kansas rule and it applies only on the Kansas side of this area: Stilwell, Olathe, Lenexa, Leawood, Prairie Village, Overland Park, Gardner and Spring Hill in Johnson County, and Bucyrus, Louisburg and Hillsdale in Miami County, Kansas. The Kansas Department of Agriculture licenses a pesticide business in each category it makes commercial applications in through its pesticide and fertilizer program, and the business must employ people certified in each subcategory it applies in. Those certifications expire on 31 December of the second calendar year after the year of issue, which means a certificate can be two years old and still current. The agency's own material is published at agriculture.ks.gov.
Missouri does it differently and the letters do not line up, which is the single easiest factual error to make in a metro that straddles a state line. Structural pest control in Missouri is certification category 7 under the Missouri Department of Agriculture's Bureau of Pesticide Control, divided into general structural, termite work covering wood-destroying organisms, and fumigation, with the department's material published at agriculture.mo.gov. Because the same letters mean different things in the two states, this site never prints a Kansas letter on a Missouri page or the reverse; the license-rules guide is the one page that sets the two schemes out, in separate sections.
Does a wet crawl space have to be fixed before anything else?
Usually it has to be understood before anything else, which is not quite the same thing. Where water is getting in, a treatment applied over the top of it is working against a condition that is still there, so the inspection records where the water has been and what appears to be bringing it.
Some of what turns up is a building-trade job rather than a pest-control one: a downspout discharging at the wall, soil graded toward the house, a plumbing leak above a joist, a vent that was closed up and never reopened. Those get written down as findings with their positions, because the homeowner needs to know about them whoever ends up doing the work.
Some of it is within reach of the same visit. Laying or repairing a barrier over bare soil, clearing lumber and cardboard off the ground, moving firewood off the wall outside, closing a hatch properly. None of that is exciting and all of it changes the conditions the next inspection will find, which is the point of having the first one written down.
What should be done before the technician comes?
Clear the access and clear a path. An unobstructed hatch or basement stair, a route around as much of the perimeter as possible, and anything stacked against the walls pulled out a foot or two. The more of that line is reachable, the more the inspection is worth.
It also helps to say in advance what the house is and what has happened to it: whether there is a crawl space under part of it and a basement under the rest, whether a lower level has been finished, whether there has been a leak, and whether anybody has treated for anything before. A finished wall over block hides the exact line a technician wants to read, and knowing that before the visit means bringing the means to deal with it.
Outside, move what is against the wall: firewood, bagged mulch, a leaning stack of lumber, pots. K-State Research and Extension's guidance on house mice makes the same point about clutter, firewood and compost against a building, and it happens to make the foundation line visible at the same time. Ten minutes of that before the visit buys a better inspection than any amount of discussion afterward.